1. Objective:
To lay down a procedure for preventive maintenance of production equipment, laboratory instruments and utilities.
2. Scope:
This procedure is applicable for preventive maintenance of production equipment,
laboratory instruments and utilities.
3. Responsibility
Engineering department
4. Procedure:
4.1 Frequency and...